Architecture studio / Lisbon / Est. 2011

A render can flatter. Only the section tells the truth.

Blueprint is a nine-person studio that resolves every junction in drawing before it resolves it in pictures. We hand contractors a document set so complete there is nothing left to guess, and nothing left to argue.

Isometric line drawing of a stepped residential building A blueprint-blue isometric drawing of a five-storey building with a rooftop setback, seated on a faint square grid, annotated with a fifteen metre height dimension, a twenty-four metre base dimension, floor level tags zero to five, a north arrow, and a title block reading Blueprint DWG BP-01, scale 1 to 200. 15.0 M 24.0 M 05 04 03 02 01 00 N BLUEPRINT DWG BP-01 / ISO / 1:200
Fig. 01 / Isometric Residential infill, Graca
1:5
smallest scale we detail to, before anyone breaks ground
0
design change orders across our last three handovers
94
sheets in a typical tender set, coordinated as one
11
years drawing in section, from a single Lisbon studio

How we work / 01 to 03

Three rules we do not bend

01 / METHOD

Section first, plan second

We design the way a building is built: from how it meets the ground to how it meets the sky. The plan follows the section, never the reverse.

02 / METHOD

Detail before image

No mood board survives contact with a threshold. We draw the reveal, the drip, the flashing at 1:5 before we render a single view.

03 / METHOD

One set of truth

Architecture, structure and services are coordinated on the same sheet. The contractor bids what is drawn, and builds exactly what was bid.

Studio principle No. 3

Drawing is not the documentation of a decision already made. Drawing is where the decision gets made.

Posted above every desk in the studio, Rua da Graca

A project, start to key

What handing us a site looks like

PH. 01 Survey and section studies.We measure the site, the light and the neighbours, then test the idea in three sections before a plan exists. 2 to 4 weeks
PH. 02 Developed design.Structure, envelope and services are drawn together. You approve real details, not a hopeful picture. 6 to 10 weeks
PH. 03 Tender documentation.The full coordinated set goes out. Contractors price certainty instead of padding for ambiguity. 4 to 8 weeks
PH. 04 On site.We answer to the drawing. Weekly on the ground, we hold the built work to the lines we committed to. On site

Now booking projects for 2027

Have a site and a deadline?

Send us the brief. We will come back with one drawing that tells you, in section, what your building actually wants to be.